This negotiated contract demonstrates our competence in pre-construction services. 

We have producing cost plans to improve cost certainty.  We have also undertaken extensive value engineering and consultations with the supply chain.​

The site is located at a busy junction above a disused rail tunnel, construction methodology.  Because of this, site logistics have been meticulously considered.​

It has developed from the original concept and the two blocks have increased to fifteen and thirteen stories.

£30 million Design & Build Contract