A two stage design and build refurbishment project within Liverpool City Centre. 

This scheme erected a two-storey rooftop extension above the exiting five floor building.  This includes the creation of a central light well and conversion of the resultant upper floor levels into 91 apartments.

Due to the city centre location we operated with restricted access for both material movement and personnel​.  Crane lift usage was only permitted on Sunday evenings and the retail premises below had to remain fully operational​.

Construction is of lightweight two-storey vertical extension incorporating metsec design, with terracotta tile and rendered elevations​.

Prior to the new extension works beginning, we completed significant demolition and temporary works.  There was also extensive asbestos removal taking place.

£4.2 million Design & Build Contract​