A £700,000 Design and Build project for the extension and refurbishment of an existing medical centre.

This scheme was technically challenging.  This is due to the extensiveness of the refurbishment and that the medical centre continued to operate.

This included the works to strip back the existing roof and to tie in that of the new extension.  Because of this the project was carefully planned over several phases.

This was also to a necessity to address the restricted site area.