Nobles have recently completed this project forming three retail units from the existing building, the fit-out of two office areas and extensive external working including trespa cladding, stone cladding, flagging and railing.

The two bespoke offices were matched to the client’s needs based on Nobles’ recommendations and the clients vision. The retail units consist of a WHSmith and a Chemist. The third unit was due to be a Wetherspoons however they have since withdrawn and so is currently up for rent with a lot of interest.

A new entrance was formed including the formation of stairs including all requirements for DDA compliance, this took place while Italia Lighting remained in operation and involved close liaison with their staff. Nobles also formed a new fire exit as the existing was deemed unusable.

Nobles worked closely with the design team to overcome a number of inherited problems with the design to ensure the building met the client’s requirements. During the works Nobles overcame major flash flooding issues caused by inadequate existing drainage. By working closely with the end user and the client Nobles implemented a drainage system including a deep Aco System and new man holes to help relieve the excess water to the new units. This liaison allowed Nobles to Handover the project on time and to budget.

Retail Case Studies